  "title": "Data centres in the Netherlands: Amsterdam, Eemshaven and hiring",
  "url": "https://globaldatacentertalent.com/articles/netherlands-talent",
  "description": "Amsterdam has 927 MW of data centre capacity and Dutch policy steers hyperscale to Eemshaven and Middenmeer. A Dutch brief on capacity, grid limits and staff.",
  "type": "market-brief",
  "cluster": "market-region-briefs",
  "market": "eu",
  "publishedAt": "2026-11-23",
  "lastReviewed": "2026-11-23",
  "dateModified": "2026-11-23",
  "author": "Workfully data centre hiring team",
  "summary": "Data centres in the Netherlands cluster around Amsterdam, which had 927 MW of operational capacity in mid-2026 but only 102 MW under construction ([Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw)). Dutch policy steers large hyperscale builds to a few designated locations, while the country has the EU's highest job vacancy rate.",
  "keyFacts": [
    {
      "text": "Amsterdam had 927 MW of operational data centre capacity in the second quarter of 2026, up 74 MW (9%) on a year earlier.",
      "source": "https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw"
    },
    {
      "text": "Amsterdam has 102 MW under construction and 251 MW in planning, a small pipeline next to its live capacity.",
      "source": "https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw"
    },
    {
      "text": "Dutch policy directs large-scale hyperscale developments to a limited number of designated locations, and growth is shifting towards Eemshaven and Middenmeer.",
      "source": "https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw"
    },
    {
      "text": "The Netherlands recorded the EU's highest job vacancy rate in the second quarter of 2026, at 4.1%, against 2.1% for the euro area.",
      "source": "https://ec.europa.eu/eurostat/web/products-euro-indicators/w/3-15092026-bp"
    },
    {
      "text": "The Netherlands reports shortages of building electricians, electrical engineers and air conditioning and refrigeration mechanics in the 2025 EURES labour shortages report.",
      "source": "https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf"
    }
  ],
  "faq": [
    {
      "question": "How much data centre capacity is there in Amsterdam?",
      "answer": "Cushman & Wakefield counted 927 MW of operational capacity in Amsterdam in the second quarter of 2026, with 102 MW under construction and 251 MW planned ([Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw)). Amsterdam is one of seven Powerhouse markets in the firm's EMEA index."
    },
    {
      "question": "Can hyperscale data centres still be built in the Netherlands?",
      "answer": "Yes, but only in a few places. Dutch policy directs large-scale hyperscale developments to a limited number of designated locations. Cushman & Wakefield names Eemshaven and Middenmeer as the clusters where growth is shifting ([Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw)). Demand for smaller sites around Amsterdam and Schiphol remains strong."
    },
    {
      "question": "Which data centre roles are hardest to fill in the Netherlands?",
      "answer": "In the EURES 2025 report, the Netherlands reports shortages of building electricians, electrical engineers, electrical engineering technicians, mechanical engineers and refrigeration mechanics ([European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf)). Construction managers and supervisors are also on the list. Those occupations make up much of a data centre build and operations team."
    },
    {
      "question": "Do data centre jobs in the Netherlands require Dutch?",
      "answer": "It depends on the role. EURES reports that knowledge of English is generally good in the North Netherlands, especially in the cities, and that German is also spoken in border areas ([EURES, Feb 2025](https://eures.europa.eu/living-and-working/labour-market-information-netherlands_en)). Roles that deal with Dutch permits, local contractors or safety paperwork are more likely to need Dutch than specialist engineering roles."
    }
  ],
  "sources": [
    {
      "title": "European Data Centre capacity surpasses 12GW",
      "publisher": "Cushman & Wakefield",
      "url": "https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw",
      "published": "2026-09-25",
      "accessed": "2026-11-23",
      "tier": "B"
    },
    {
      "title": "Kabinet beperkt mogelijkheid tot vestiging hyperscale datacentra (Cabinet restricts the possibility of establishing hyperscale data centres)",
      "publisher": "Rijksoverheid (Government of the Netherlands)",
      "url": "https://www.rijksoverheid.nl/actueel/nieuws/2022/06/10/kabinet-beperkt-mogelijkheid-tot-vestiging-hyperscale-datacentra",
      "published": "2022-06-10",
      "accessed": "2026-11-23",
      "tier": "A"
    },
    {
      "title": "Cushman & Wakefield: European data centre growth is shifting",
      "publisher": "Cushman & Wakefield",
      "url": "https://www.cushmanwakefield.com/en/netherlands/news/2026/04/emea-datacentre-update-h2-2025",
      "published": "2026-04-28",
      "accessed": "2026-11-23",
      "tier": "B"
    },
    {
      "title": "H1 2026 EMEA Data Centre Market Update",
      "publisher": "Cushman & Wakefield",
      "url": "https://www.cushmanwakefield.com/en/insights/emea-data-centre-update",
      "published": "2026-09-14",
      "accessed": "2026-11-23",
      "tier": "B"
    },
    {
      "title": "EMEA data centre mid-year 2026 report",
      "publisher": "JLL",
      "url": "https://www.jll.com/en-uk/insights/emea-data-centre-report",
      "published": "2026-08-03",
      "accessed": "2026-11-23",
      "tier": "B"
    },
    {
      "title": "Euro area job vacancy rate at 2.1%",
      "publisher": "Eurostat",
      "url": "https://ec.europa.eu/eurostat/web/products-euro-indicators/w/3-15092026-bp",
      "published": "2026-09-15",
      "accessed": "2026-11-23",
      "tier": "A"
    },
    {
      "title": "EURES – Report on labour shortages and surpluses 2025, Annex: Transnational matching possibilities",
      "publisher": "European Labour Authority",
      "url": "https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf",
      "published": "2026-06",
      "accessed": "2026-11-23",
      "tier": "A"
    },
    {
      "title": "Labour market information: Netherlands",
      "publisher": "EURES (European Commission)",
      "url": "https://eures.europa.eu/living-and-working/labour-market-information-netherlands_en",
      "published": "2025-02-24",
      "accessed": "2026-11-23",
      "tier": "A"
    },
    {
      "title": "What the latest data reveals about labour market imbalances across Europe",
      "publisher": "EURES (European Commission)",
      "url": "https://eures.europa.eu/what-latest-data-reveals-about-labour-market-imbalances-across-europe-2026-06-29_en",
      "published": "2026-06-29",
      "accessed": "2026-11-23",
      "tier": "A"
    }
  ],
  "related": [
    "https://globaldatacentertalent.com/articles/germany-frankfurt-talent",
    "https://globaldatacentertalent.com/articles/ireland-talent",
    "https://globaldatacentertalent.com/articles/nordics-talent",
    "https://globaldatacentertalent.com/articles/grid-connection-manager"
  ],
  "bodyMarkdown": "The Netherlands' data centre (data center in US usage) market is built around Amsterdam, one of seven \"Powerhouse\" markets in Cushman & Wakefield's EMEA index ([Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/insights/emea-data-centre-update)). The live base is large, the city pipeline is small, and the biggest new campuses are going elsewhere. For hiring teams, the question is which sites will need people, and where those people will come from.\n\n## How big is the Dutch data centre market in 2026?\n\nAmsterdam had 927 MW of operational capacity in the second quarter of 2026, up 74 MW or 9% on a year earlier ([Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw)).\n\nNew supply is modest. Amsterdam delivered 16.3 MW of new capacity in the first half of 2026 ([JLL, Aug 2026](https://www.jll.com/en-uk/insights/emea-data-centre-report)). JLL puts Amsterdam's vacancy at around 6.5% after a multi-year decline ([JLL, Aug 2026](https://www.jll.com/en-uk/insights/emea-data-centre-report)).\n\n| Location | Role in the Dutch market | Capacity | Stated constraint | Likely hiring effect | Source |\n|---|---|---|---|---|---|\n| Amsterdam and Schiphol area | Main colocation hub, with continued demand including sub-hyperscale projects | Amsterdam: 927 MW operational, 102 MW under construction, 251 MW planned | Small pipeline next to the capacity already live | Operations, expansion and fit-out roles close to the existing labour pool | [Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw) |\n| Eemshaven and Middenmeer | Large-scale hyperscale clusters where growth is shifting | Not reported separately | Hyperscale limited to designated locations | Large build and commissioning teams | [Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw) |\n| Groningen | Emerging scalable alternative to Amsterdam | Not reported separately | Fewer constraints: space and relatively better power access | Regional hiring in a tight northern labour market | [Cushman & Wakefield, Apr 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/04/emea-datacentre-update-h2-2025) |\n\nThe hiring-effect column is a synthesis for hiring teams, not part of the cited reports.\n\n## Why is Amsterdam's pipeline so small?\n\nPolicy and power both limit it. Cushman & Wakefield traces the constrained pipeline mainly to the data centre moratorium introduced in 2019, which has since been replaced by a more restrictive policy framework ([Cushman & Wakefield, Apr 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/04/emea-datacentre-update-h2-2025)). It also cites stricter regulation and political pressure over energy use and land. It says the smaller pipeline has pushed Amsterdam down to fifth place among Europe's top locations.\n\nWhere permits have already been granted, construction can proceed despite political opposition ([Cushman & Wakefield, Apr 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/04/emea-datacentre-update-h2-2025)). For a hiring team, a project with a permit and a grid date has a real programme; one still waiting on either does not yet need a site team.\n\n## Where is new Dutch capacity being built?\n\nAway from Amsterdam for the largest projects. Dutch policy directs large-scale hyperscale developments to a limited number of designated locations, and growth is shifting towards the Eemshaven and Middenmeer clusters ([Cushman & Wakefield, Sep 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/09/europese-datacenter-capaciteit-passeert-de-12gw)). Demand around Amsterdam and Schiphol remains strong, including for sub-hyperscale projects.\n\nIn 2022 the Dutch cabinet approved a draft decree stopping municipalities from allowing new hyperscale data centres ([Government of the Netherlands, Jun 2022](https://www.rijksoverheid.nl/actueel/nieuws/2022/06/10/kabinet-beperkt-mogelijkheid-tot-vestiging-hyperscale-datacentra)). It had two exceptions: part of Het Hogeland in Groningen, and the Agriport sites in Hollands Kroon, North Holland. The cabinet cited enough space and green power from offshore wind there. Check the current binding text with counsel before relying on it for a site.\n\nGroningen is the other name to watch. Cushman & Wakefield describes it as a scalable alternative that offers space, relatively better access to power and often shorter development lead times ([Cushman & Wakefield, Apr 2026](https://www.cushmanwakefield.com/en/netherlands/news/2026/04/emea-datacentre-update-h2-2025)). That moves part of the hiring demand to the north of the country, where the labour market is already tight.\n\n## How tight is the Dutch labour market?\n\nBy one measure, the tightest in the EU. The Netherlands recorded the highest job vacancy rate in the EU in the second quarter of 2026, at 4.1%, against 2.1% for the euro area ([Eurostat, Sep 2026](https://ec.europa.eu/eurostat/web/products-euro-indicators/w/3-15092026-bp)). Across the EU, the rate in industry and construction was 1.8% ([Eurostat, Sep 2026](https://ec.europa.eu/eurostat/web/products-euro-indicators/w/3-15092026-bp)).\n\nThe north is no easier. EURES reports that 27,500 vacancies remained unfilled in the North Netherlands in 2024, most of them for technical professions ([EURES, Feb 2025](https://eures.europa.eu/living-and-working/labour-market-information-netherlands_en)). Unemployment in Groningen was around 4.0% ([EURES, Feb 2025](https://eures.europa.eu/living-and-working/labour-market-information-netherlands_en)).\n\n## Which data centre skills are short in the Netherlands?\n\nMost of the trades and engineers that build and run a data centre. In the 2025 EURES report, the Netherlands reports shortages in these occupations ([European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf)).\n\n| Occupation (EURES classification) | Netherlands reports a shortage? | Typical data centre roles | Source |\n|---|---|---|---|\n| Building and related electricians | Yes | Site electricians, electrical supervisors | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n| Electrical engineers | Yes | Electrical leads, commissioning engineers, authorised persons | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n| Electrical engineering technicians | Yes | Critical facilities technicians, shift engineers | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n| Mechanical engineers | Yes | Mechanical leads, cooling design and commissioning | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n| Air conditioning and refrigeration mechanics | Yes | Cooling technicians, mechanical shift engineers | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n| Plumbers and pipe fitters | Yes | Chilled-water and liquid-cooling installation | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n| Construction managers and supervisors | Yes | Construction managers, MEP managers, site supervisors | [European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf) |\n\nThe role mapping is a guide for hiring teams, not part of the EURES classification.\n\nThe same report points to where candidates may be found. Greece and Finland both report surpluses of electrical engineers ([European Labour Authority, Jun 2026](https://www.ela.europa.eu/sites/default/files/2026-06/annex-labour-shortages-report-ela-2025.pdf)). Across Europe, 98% of occupations short in at least one country are in surplus in another ([EURES, Jun 2026](https://eures.europa.eu/what-latest-data-reveals-about-labour-market-imbalances-across-europe-2026-06-29_en)).\n\n## What does this mean for hiring teams?\n\nDutch hiring now has two shapes. Amsterdam needs operations staff for a large live estate plus teams for expansion within tight limits. The designated hyperscale clusters need large construction and commissioning teams in places with smaller local labour pools.\n\nBoth compete for electricians, electrical engineers and cooling specialists that the Netherlands already reports as short. Cross-border sourcing is therefore part of most plans, and language is an early decision. English is generally good in the North Netherlands, and German is spoken in border areas ([EURES, Feb 2025](https://eures.europa.eu/living-and-working/labour-market-information-netherlands_en)).\n\nChecklist for staffing a Dutch data centre site:\n\n1. Confirm the permit status and grid connection date before opening senior searches.\n2. Separate Amsterdam expansion roles from hyperscale cluster roles, since the labour pools differ.\n3. Map each hire to its phase: design, construction, commissioning or operations.\n4. Decide which roles need Dutch for permits, contractors and safety documents, and which can run in English.\n5. Check which nearby campuses will compete for the same electrical and mechanical supervisors.\n6. Plan cross-border searches for electrical engineers early, starting with countries that report a surplus.\n7. Budget for travel or relocation where a site sits far from the Amsterdam labour pool.\n8. Hire the future site manager before handover, so they learn the plant during commissioning.\n\nFor other European hotspots, see the briefs on [data centres in Germany](/articles/germany-frankfurt-talent), [data centres in Ireland](/articles/ireland-talent) and [data centres in the Nordics](/articles/nordics-talent). For the role that secures power dates, see [the grid connection manager](/articles/grid-connection-manager).\n\nHiring for a data centre in the Netherlands? Workfully is an AI-native recruiting partner built around your hiring needs. Senior specialist recruiters deliver the hires your business needs without scaling your recruiting team. Your team interviews and decides ([Workfully for data centres](https://workfully.com/data-centres))."
}